How to install a usg suspended ceiling 1.
Usg drop ceiling installation.
Bend each hanger wire to a 90 degree angle 3 4 above the string line.
Ceiling designs can be submitted and all of the parts and pieces for the installation will be manufactured and shipped out as a kit for faster and easier installation.
Medium textured with a non directional pattern these sag resistant panels are an optimal choice for use in schools corridors lobbies offices and retail stores.
Usg donn brand dx dxl standard 15 16in.
Choosing the best ceiling for your project can make all the difference.
Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Pull each hanger wire.
Insert tabs into slots in the main tee.
Usg donn brand dxt dxlt centricitee 9 16in.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the length of a single panel add the remainder to the length of a single panel and divide by 2.
Although the components cannot be bent at the jobsite usg offers complete factory curved components for curved ceilings domes and vaults.
The cross tee slots must line up.
With an unparalleled variety of choices no matter what your ceiling needs we have you covered.
Install lag screws at 4 intervals along the main tee string lines.
Usg donn brand dxw wide faced 1 1 2in.
Where two cross tees occupy the same slot insert the second cross tee to the left of the first cross tee.
Usg donn brand dxla aluminum capped fire rated 15 16in.
Snap a chalk line at this.
Usg donn brand dxf dxlf fineline 9 16in.
Measure three quarters of an inch up toward the ceiling from the mark you made in step 1.
Measure down 4 inches from the bottom of this object.
Place usg wall.
Cut the main tees for the drop ceiling hangers.
Measure and cut the main tees according to a cross tee guideline.
Radar acoustical ceiling panels contain a proprietary broad spectrum standard formulation that inhibits the growth of mold and mildew.
Examine the ceiling to find the lowest pipe duct or conduit.
Don t assume the wall is straight.
Attach a hanger wire to each screw and cut 6 below the string line.